The replacement kitchen cabinets came in & the installer was working yesterday. That's great news because we can move forward with the kitchen counters, which means it won't hold up the tile guy. Yahoo.
The concrete is poured for the front walkway so that's the end of the concrete. There is still some work to do in the front, but mostly just gravel. We toyed with the idea of another surface out there, but at this point, gravel looks like a good option (meaning: affordable).
We are back in rental house number two and will be here for a few weeks. Things are moving along well, but I still don't think we'll hit August 3rd - it's just too close. Maybe the 10th?
I'll try to upload some new photos early in the week. Things are settling down after this last move, so I should have some time....